I am now accessing as a :

Government Of Assam Power

Running Projects of APGCL

  • Assam Power Generation Corporation Ltd. (APGCL) was constituted after unbundling of ASEB in Dec 2004 through State Power Sector Reforms Programme under the provision of Electricity Act’2003. The final Transfer scheme was implemented on Aug’2005 with a new Company Balance Sheet w.e.f. April 2005. The company is mainly responsible for maximum energy generation to meet up the energy demand in the state. The Total Installed Capacity of APGCL is 379.7 MW and APGCL Peak Generation is around 250 MW.

    APGCL comprises of 4 running Power Stations :
    1) Namrup Thermal Power Station (NTPS) (119.5 MW), Namrup, Dibrugarh

     
    UnitTypeCapacity (MW)
    1Gas Turbine20
    1Gas Turbine21
    1Gas Turbine21
    1Gas Turbine11
     TOTAL119.5 MW

    2) Lakwa Thermal Power Station (LTPS) (157.2 MW), Maibella, Lakwa, Sivsagar

     
    UnitTypeCapacity (MW)
    1Gas Turbine15
    2Gas Turbine15
    3Gas Turbine15
    4Gas Turbine15
    5Gas Turbine20
    6Gas Turbine20
    7Gas Turbine20
    8Gas Turbine37.2
     TOTAL157.2 MW

    3) Karbi Langpi Hydro Electric Project (KLHEP) (100 MW) , Lengry, Amtereng, Boithalangso, Karbi Anglong:

    1Hydro Turbine502Hydro Turbine50

     
    UnitTypeCapacity (MW)
      100

    4) Myntriang Hydro Electric Project (MSHEP) St-II (3 MW), Lengry, Amtereng, Karbi Anglong:

    UnitTypeCapacity (MW)
    1Hydro Turbine1.5
    2Hydro Turbine1.5
     TOTAL

    LAST 3 YEARS GROSS GENERATION OF APGCL IS:

     
    YearGeneration (MU)
    2015-20161851.11
    2014-20151893.76
    2013-20141845.23